Barr Beacon Academy Case Study

Along with Amtico and their in-house design team, we were put forward to carry out these works to ensure they were fitted in accordance with their guidelines. As an Amtico approved contractor, we used specialist plans provided by them, and we successfully installed 480m2, on time. The floor varied in colour / pattern and tile sizes, with the addition of feature stripping, to give the school exactly what they wanted, with peace of mind the installation quality would be second to none. As part of this challenge, we were also responsible for the removal of all existing floors and ensuring all sub floor levels were smooth and flat. Particular attention was paid to the preparation of the space, due to the removal of some walls.