Leicester NHS – St Lukes Hospital

As part of a state of the art modular building, which was shipped all the way from Dubai, we were contracted as part of the finishes packages to complete this structure once on site. As the building was pre fabricated and arrived with chipboard floors firstly we installed a 6mm plywood to all areas to guarantee our finishes. We then installed a variety a Polyflor products incorporating skirting details to create a great detail finish to add to this new style of building.